As a result of the Russian shelling at the Zaporizhzhia NPP, the emergency protection was activated and the working power unit No. 5 was shut down
![As a result of the Russian shelling at the Zaporizhzhia NPP, the emergency protection was activated and the working power unit No. 5 was shut down](/storage/lp/3816/296cef36fa70cee01a6dae2d442dd4227808155b.jpg)
The Russians damaged the backup power supply line for ZNPP's own needs. In the transition mode, the non-working power unit No. 2 was de-energized, diesel generators were started.
Power unit No. 6 continues to work in the energy system of Ukraine.