As a result of the Russian shelling at the Zaporizhzhia NPP, the emergency protection was activated and the working power unit No. 5 was shut down

As a result of the Russian shelling at the Zaporizhzhia NPP, the emergency protection was activated and the working power unit No. 5 was shut down

The Russians damaged the backup power supply line for ZNPP's own needs. In the transition mode, the non-working power unit No. 2 was de-energized, diesel generators were started.

Power unit No. 6 continues to work in the energy system of Ukraine.